Description: Sections of the Road Inventory that have designated values for Access Control, which classified the level of accessibility for a road segment when the road was designed. A route with full access control gives preference to through traffic by providing interchanges with selected public roads and prohibiting crossing at-grade or direct driveway connections. A route with partial access control may have some crossings at-grade with public roads but direct private driveway connections are minimized. A route with no access control allows full access.